Customization: | Available |
---|---|
Type: | LED Billboard |
Material: | Stainless Steel+Acrylic |
Still deciding? Get samples of US$ 50/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
CE UL ROHS approval led advertising letters signs 3d letters
1.Laser cut 304#/316# 0.8-1.0mm stainless steel as the channel letters' frame,
leave about 10mm's surrouding edge;
2.Powder coted /electroplate the shaped stainless steel channel letter'ssurface
to be the color you like;
3.Use waterproof LED module,put it in the inside of the channel letters,stick it;
4.Laser cut the 3.0mm's thickness of acrylic panel as the shapes of the stainless steel LED channel letters we have finished;
5.Put the laser cut acrylic panel into the surrouding edge of the LED channel letter;
6.Connect transformer:12V&20A;
7.Connect the electristy,then the whole set of LED channel letter will bright as the acrylic panel's color;
Model | CE UL ROHS approval led advertising letters signs 3d letters |
Material | Face : stainless steel 304/316/ or aluminum |
Side:304/316 grade stainless steel or aluminum | |
Back : acrylic or PC panel | |
Thickness | According to size of products |
Size | Customized |
Effect | Front: Polished/ burshed/ painting |
Back: N/A | |
Color | Front : Stainless Steel/ Aluminum ( Accept painting for custom color ) |
Back: Acrylic ( Available for custom color) or not | |
Light Source | Led Moudle / led Strip/ led circuit board |
Light Effect | Front Illuminated |
Led life time | > 50,000 hrs |
Working temperature | -40°C to 80°C |
Power Supply | Input 110-240V/ AC; output: 12V/ AC |
Accessories |
Power supply, installation template and all installation accessories |
Installation |
Screw rod |
Application Environment |
Outdoor hotel, hospital, retail store, shopping mall, metro station, gas station, amusement park and various public places. |
Delivery |
By Express ( door to door service, about 5-8 days ) |
By Air ( door to airport, about 5-8 days ) |
|
By Sea ( warehouse to warehouse, takes about 25-35 days ) |
|
Lead Time |
According to the cargo quantity |
Warranty |
24 months or long time if you need |